Optimize assignments
Live solver internals and logs
No optimization run yet.
Network switches and feasibility currents (network method)
Rush periods: 11 AM–1 PM and 5 PM–7 PM. Position changes during rush receive an additional solver penalty. Day/Night splits at 2 PM.
Required positions are prioritized. Orange = trainee without a leader; red = coverage gap. DT Bagger, FC Bagger, Organizer and Register 1 are non-negotiable. Dual bagger coverage is permitted, with an extra penalty after 10 AM. Red employee chips indicate designated leaders.
Coverage board
Edit schedule, capabilities and optimization weights (JSON)
Each employee's skills range from 0–3.
Leadership is a Boolean field: "lead": true or false.
Edits are sent to the Python solver, not saved to the server.